“中央大脑”项目开始了成都 - 尚古安中央线高
栏目:专题报道 发布时间:2025-06-27 10:05
Chongqing Daily (New Chongqing-Chongqing Daily Reporter Yang Nizi) at 10:00 on June 26, at the construction area between the Chengdu-Chongqing Middle Line High-Speed ​​Railway (from here Post that is hoisted at the place of the place, the Chengdu-chongqing middle line high-speed railway, as "Central Brain", has been officially launched. The Chengdu-chongqing middle line high-speed铁路是从河道河道的组成部分,“八个垂直和八个水平”的高速火车网络从重庆枢纽的重庆北站开始。站点长292公里,设计的速度为350公里。n高速金属的结构。它是整个高速金属的“中央大脑”和电源。这是与高速金属结构的主要链接。它具有长线特性,高技术标准和高建筑困难。 After completing the Chengdu-chongqing middle line high-speed railway, it was connected to the Xi'an-chengdu high-speed metals, the zhengzhou-chongqing high-speed metals, the Xining-chengdu high-speed railroad, the Chengdu-Dazhou-Wanzhou High-speed Rail High-speed railway chongqing-kunming high-speed metals, and the重庆 - 温州高速金属,这对于与成都 - 昌对双城经济圈的腹泻相具有重要意义,并促进了新的西方发展模式的发展。负责编辑:Deng Minlu在发表演讲时请遵守服务协议的新闻答复
服务热线
400-123-4567